Liquified Natural Gas
Liquified Natural Gas​ (LNG)
KJE has been a preferred contractor at Cameron LNG for over 8 years, completing more than 300 projects in
support of LNG liquefaction operations. Our work focuses on non energized testing and verification activities
including motor starter testing, instrument calibration, loop checks, insulation resistance testing, MCC and
control circuit continuity verification, interlock testing, and equipment function verification. Recent
recognitions include the Cameron LNG Train 1 Turnaround Accolade (2025) and Cameron LNG Work
Permitting Recognition (2023).
- Pre cast blast resistant building electrical buildouts (control rooms, operations and maintenance buildings, warehouses, laboratories, security facilities)
- Special systems: grounding, lightning protection, fire and gas detection, telecommunications, security, and plant radio
- Low voltage controls, UPS systems, hydrogen gas detection, sample station modifications
- Medium voltage cabling, terminations, fiber optic terminations, and MV testing and commissioning
- Hurricane response and emergency restoration
LNG Anchor Clients
- Cameron LNG (Sempra Infrastructure)
- Cheniere Energy (Sabine Pass and Corpus Christi)
- Venture Global LNG (Calcasieu Pass and Plaquemines)
- Golden Pass LNG (ExxonMobil and QatarEnergy joint venture)
Let’s Talk About Your Facility Needs
From complex process environments to critical infrastructure, Kaough & Jones delivers industrial electrical solutions built for real world performance.